After training, the combination of industry-leading Documentation Templates and Review Checklists is the most cost-effective way to accelerate your DO-254 program. Our most popular offering is a discounted bundle of both resources, but you can also purchase Templates and Checklists separately. We also sell licenses for the single team/site (for smaller companies) as well as corporate licenses (for mid-to-large sized companies).
Note that if your are unable to purchase online because your company requires a traditional quoting/payment process, please email us for a quote by clicking here.
Request For Quote
DO-254 Documentation Template Set (PN 2101)
DO-254 Documentation Template Set (PN 2101) – Single Site/Team License
Description:
This is a comprehensive (500+ page) Documentation Template Set that covers the full needs of documentation for any DO-254 program. This is the most comprehensive, up-to-date, and instructional set of DO-254 documentation templates available in the industry. This set can save hundreds of engineering hours in the preparation of your project plans and program documents. Note that this license is for unlimited perpetual use of this version for single site/project team.
DO-254 Documentation Template Set (PN 2101) – Single Site/Team License
Contents:
- Plan for Hardware Aspects of Certification (PHAC)
- Hardware Development Plan (HDP)
- Hardware Validation and Verification Plan (HVVP)
- Hardware Configuration Management Plan (HCMP)
- Hardware Process Assurance Plan (HPAP)
- Hardware Requirements Standards (HRS)
- Hardware Design Standards (HDS), includes HDL coding standards
- Hardware Validation and Verification Standards (HVVS)
- Hardware Requirements Document (HRD)
- Hardware Design Document (HDD)
- Hardware Test Procedures (HTP)
- Hardware Configuration/Environment Configuration Index (HCI-HECI)
- Verification Configuration Index (VCI)
- Requirements Traceability Matrix (RTM)
- Hardware Verification Results (HVR)
- HW Records Spreadsheet
- Hardware Accomplishment Summary (HAS)
- Tool Qualification Plan and Data sample document
- Change Impact Analysis (CIA)
- DO-254 Editable Diagrams (in free Draw.io format)
DO-254 Documentation Template Set (PN 2102)
DO-254 Documentation Template Set (PN 2102) – Corporate License
Description:
This is a comprehensive (500+ page) Documentation Template Set that covers the full needs of documentation for any DO-254 program. This is the most comprehensive, up-to-date, and instructional set of DO-254 documentation templates available in the industry. This set can save hundreds of engineering hours in the preparation of your project plans and program documents. Note that this license is for unlimited perpetual use of this version for corporate-wide usage.
DO-254 Documentation Template Set (PN 2102) – Corporate License
Contents:
- Plan for Hardware Aspects of Certification (PHAC)
- Hardware Development Plan (HDP)
- Hardware Validation and Verification Plan (HVVP)
- Hardware Configuration Management Plan (HCMP)
- Hardware Process Assurance Plan (HPAP)
- Hardware Requirements Standards (HRS)
- Hardware Design Standards (HDS), includes HDL coding standards
- Hardware Validation and Verification Standards (HVVS)
- Hardware Requirements Document (HRD)
- Hardware Design Document (HDD)
- Hardware Test Procedures (HTP)
- Hardware Configuration/Environment Configuration Index (HCI-HECI)
- Verification Configuration Index (VCI)
- Requirements Traceability Matrix (RTM)
- Hardware Verification Results (HVR)
- HW Records Spreadsheet
- Hardware Accomplishment Summary (HAS)
- Tool Qualification Plan and Data sample document
- Change Impact Analysis (CIA)
- DO-254 Editable Diagrams (in free Draw.io format)
DO-254 Review Checklist Set (PN 2103)
DO-254 Review Checklist Set (PN 2103) – Single Site/Team License
Description:
This comprehensive set of (35+) Peer and Transition Review Checklists can be used by the entire team throughout the project and specifically can be an invaluable guide for the Process Assurance engineering role. Note that this license is for unlimited perpetual use of this version for single site/project team.
DO-254 Review Checklist Set (PN 2103) – Single Site/Team License
Contents:
Peer Review Checklist Set includes:
- Pre/Post Peer Review Audit Checklist for PA
- PHAC checklist
- IP-COTS-PDH checklist
- HDP checklist
- HVVP checklist
- HCMP checklist
- HPAP checklist
- HRS checklist
- HDS checklist
- HVVS checklist
- Tool Qualification Plan checklist
- HRD checklist
- HDD checklist
- Design/Code checklist
- Model-Based Design checklist
- Generated Code checklist
- HTP checklist
- HCI checklist
- HECI checklist
- VCI checklist
- HVR checklist
- RTM checklist
- Tool Qualification Data checklist
- HAS checklist
Transition Review Checklist Set includes:
- General Audit checklist
- Transition to Planning checklist
- Transition from Planning checklist
- Transition from Requirements checklist
- Transition from Conceptual Design checklist
- Transition from Detailed Design checklist
- Transition from Implementation checklist
- Test Readiness Review checklist
- Final Compliance Review checklist
- Hardware Conformity Review checklist
DO-254 Review Checklist Set (PN 2104)
DO-254 Review Checklist Set (PN 2104) – Corporate License
Description:
This comprehensive set of (35+) Peer and Transition Review Checklists can be used by the entire team throughout the project and specifically can be an invaluable guide for the Process Assurance engineering role. Note that this license is for unlimited perpetual use of this version for corporate-wide usage.
DO-254 Review Checklist Set (PN 2104) – Corporate License
Contents:
Peer Review Checklist Set includes:
- Pre/Post Peer Review Audit Checklist for PA
- PHAC checklist
- IP-COTS-PDH checklist
- HDP checklist
- HVVP checklist
- HCMP checklist
- HPAP checklist
- HRS checklist
- HDS checklist
- HVVS checklist
- Tool Qualification Plan checklist
- HRD checklist
- HDD checklist
- Design/Code checklist
- Model-Based Design checklist
- Generated Code checklist
- HTP checklist
- HCI checklist
- HECI checklist
- VCI checklist
- HVR checklist
- RTM checklist
- Tool Qualification Data checklist
- HAS checklist
Transition Review Checklist Set includes:
- General Audit checklist
- Transition to Planning checklist
- Transition from Planning checklist
- Transition from Requirements checklist
- Transition from Conceptual Design checklist
- Transition from Detailed Design checklist
- Transition from Implementation checklist
- Test Readiness Review checklist
- Final Compliance Review checklist
- Hardware Conformity Review checklist
DO-254 Accelerator Bundle (PN 2105)
DO-254 Accelerator Bundle (PN 2105) – Single Site/Team License
Description:
You may have seen DO-254 templates offered from other companies. Look closely. Not all templates are the same. Far from it!
The DO-254 Accelerator Bundle is not just any old template set. It creates a whole new level of value to DO-254 teams. While the bundle includes both templates and checklists, it’s much more than that.
The documentation template set offers >500 pages across 19 key documents that includes instructional, sample, and/or pre-written (i.e., reusable) text you can leverage to accelerate the dreaded “Planning” phase of your program as well as educate teams throughout the process. This valuable set is bound to shave hundreds if not thousands of engineering hours from your project resource requirements. (At your engineering cost per hour, how much is that worth to you?). In addition, the information in these templates represents consulting expertise you’d normally have to pay top dollar for. The set of 25 Peer Review checklists keeps the entire team on track throughout the program. The set of 10 Transition Review checklists acts as a Job Aid for the Process Assurance engineer. Together these checklists dramatically lower the risk of encountering a “finding” during certification audits.
Beyond the templates and checklists, this DO-254 Accelerator Bundle provides a one-hour consultation with a DER to discuss the issues and concerns with your program.
The DO-254 Accelerator Bundle represent thousands of hours of engineering and certification work. It was developed by a team with 30 years’ experience in developing avionics and using older templates on hundreds of projects over the years. We’ve taken the best advice and learnings from these programs/experience/templates and incorporated it all into this bundle.
If you have purchased and used our original DO-254 templates, here’s what’s different with this Upgrade. The documents:
- Are more succinct and efficient
- Are more descriptive and loaded with educational text – they are literally a training guide for the whole team
- Are loaded with “best practice” advice – hundreds of hours of consulting/learning built in, it’s like having a consultant on your team!
- Are DAL Adjustment
- Templates include both tables and numerous notes about DAL applicability throughout
- Checklists have each question tied to a DAL for easy filtering to the proper DAL
- Incorporate requirements/objectives/clarifications from the very latest DO-254 guidance documents, including:
- Order 8110.105A
- AMC 20-152A
- EASA SWCEH-001 Issue 01 Revision 02
- EASA CM-AS-004 issue 01 (SEE)
- AMC 20-193
- AMC 20-189
- AC 00-71
- AC 00-72
- Include all new content such as:
- Best practice HDL coding guideline in both the templates and checklists
- Model-based design checklist
- Generated code checklist
- DO-254 Tool Qualification Plan/Data sample
- Pertinent content from several DO-254 User Group papers
- Templates cover full content of Peer Review Checklists
- Templates include editable design life cycle and other diagrams (using the free draw.io application)
All in all, you can save yourself tens of thousands of dollars in consulting fees and avoid expensive mistakes with all the built-in intelligence in the DO-254 Accelerator Bundle.
DO-254 Accelerator Bundle (PN 2105) – Single Site/Team License
Contents:
Templates include:
- Plan for Hardware Aspects of Certification (PHAC)
- Hardware Development Plan (HDP)
- Hardware Validation and Verification Plan (HVVP)
- Hardware Configuration Management Plan (HCMP)
- Hardware Process Assurance Plan (HPAP)
- Hardware Requirements Standards (HRS)
- Hardware Design Standards (HDS), includes HDL coding standards
- Hardware Validation and Verification Standards (HVVS)
- Hardware Requirements Document (HRD)
- Hardware Design Document (HDD)
- Hardware Test Procedures (HTP)
- Hardware Configuration/Environment Configuration Index (HCI-HECI)
- Verification Configuration Index (VCI)
- Requirements Traceability Matrix (RTM)
- Hardware Verification Results (HVR)
- HW Records Spreadsheet
- Hardware Accomplishment Summary (HAS)
- Tool Qualification Plan and Data sample document
- Change Impact Analysis (CIA)
- DO-254 Editable Diagrams (in free Draw.io format)
Peer Review Checklist Set includes:
- Pre/Post Peer Review Audit Checklist for PA
- PHAC checklist
- IP-COTS-PDH checklist
- HDP checklist
- HVVP checklist
- HCMP checklist
- HPAP checklist
- HRS checklist
- HDS checklist
- HVVS checklist
- Tool Qualification Plan checklist
- HRD checklist
- HDD checklist
- Design/Code checklist
- Model-Based Design checklist
- Generated Code checklist
- HTP checklist
- HCI checklist
- HECI checklist
- VCI checklist
- HVR checklist
- RTM checklist
- Tool Qualification Data checklist
- HAS checklist
Transition Review Checklist Set includes:
- General Audit checklist
- Transition to Planning checklist
- Transition from Planning checklist
- Transition from Requirements checklist
- Transition from Conceptual Design checklist
- Transition from Detailed Design checklist
- Transition from Implementation checklist
- Test Readiness Review checklist
- Final Compliance Review checklist
- Hardware Conformity Review checklist
DO-254 Accelerator Bundle (PN 2106)
DO-254 Accelerator Bundle (PN 2106) – Corporate License
Description:
You may have seen DO-254 templates offered from other companies. Look closely. Not all templates are the same. Far from it!
The DO-254 Accelerator Bundle is not just any old template set. It creates a whole new level of value to DO-254 teams. While the bundle includes both templates and checklists, it’s much more than that.
The documentation template set offers >500 pages across 19 key documents that includes instructional, sample, and/or pre-written (i.e., reusable) text you can leverage to accelerate the dreaded “Planning” phase of your program as well as educate teams throughout the process. This valuable set is bound to shave hundreds if not thousands of engineering hours from your project resource requirements. (At your engineering cost per hour, how much is that worth to you?). In addition, the information in these templates represents consulting expertise you’d normally have to pay top dollar for. The set of 25 Peer Review checklists keeps the entire team on track throughout the program. The set of 10 Transition Review checklists acts as a Job Aid for the Process Assurance engineer. Together these checklists dramatically lower the risk of encountering a “finding” during certification audits.
Beyond the templates and checklists, this DO-254 Accelerator Bundle provides a one-hour consultation with a DER to discuss the issues and concerns with your program.
The DO-254 Accelerator Bundle represent thousands of hours of engineering and certification work. It was developed by a team with 30 years’ experience in developing avionics and using older templates on hundreds of projects over the years. We’ve taken the best advice and learnings from these programs/experience/templates and incorporated it all into this bundle.
If you have purchased and used our original DO-254 templates, here’s what’s different with this Upgrade. The documents:
- Are more succinct and efficient
- Are more descriptive and loaded with educational text – they are literally a training guide for the whole team
- Are loaded with “best practice” advice – hundreds of hours of consulting/learning built in, it’s like having a consultant on your team!
- Are DAL Adjustment
- Templates include both tables and numerous notes about DAL applicability throughout
- Checklists have each question tied to a DAL for easy filtering to the proper DAL
- Incorporate requirements/objectives/clarifications from the very latest DO-254 guidance documents, including:
- Order 8110.105A
- AMC 20-152A
- EASA SWCEH-001 Issue 01 Revision 02
- EASA CM-AS-004 issue 01 (SEE)
- AMC 20-193
- AMC 20-189
- AC 00-71
- AC 00-72
- Include all new content such as:
- Best practice HDL coding guideline in both the templates and checklists
- Model-based design checklist
- Generated code checklist
- DO-254 Tool Qualification Plan/Data sample
- Pertinent content from several DO-254 User Group papers
- Templates cover full content of Peer Review Checklists
- Templates include editable design life cycle and other diagrams (using the free draw.io application)
All in all, you can save yourself tens of thousands of dollars in consulting fees and avoid expensive mistakes with all the built-in intelligence in the DO-254 Accelerator Bundle.
DO-254 Accelerator Bundle (PN 2106) – Corporate License
Contents:
Templates include:
- Plan for Hardware Aspects of Certification (PHAC)
- Hardware Development Plan (HDP)
- Hardware Validation and Verification Plan (HVVP)
- Hardware Configuration Management Plan (HCMP)
- Hardware Process Assurance Plan (HPAP)
- Hardware Requirements Standards (HRS)
- Hardware Design Standards (HDS), includes HDL coding standards
- Hardware Validation and Verification Standards (HVVS)
- Hardware Requirements Document (HRD)
- Hardware Design Document (HDD)
- Hardware Test Procedures (HTP)
- Hardware Configuration/Environment Configuration Index (HCI-HECI)
- Verification Configuration Index (VCI)
- Requirements Traceability Matrix (RTM)
- Hardware Verification Results (HVR)
- HW Records Spreadsheet
- Hardware Accomplishment Summary (HAS)
- Tool Qualification Plan and Data sample document
- Change Impact Analysis (CIA)
- DO-254 Editable Diagrams (in free Draw.io format)
Peer Review Checklist Set includes:
- Pre/Post Peer Review Audit Checklist for PA
- PHAC checklist
- IP-COTS-PDH checklist
- HDP checklist
- HVVP checklist
- HCMP checklist
- HPAP checklist
- HRS checklist
- HDS checklist
- HVVS checklist
- Tool Qualification Plan checklist
- HRD checklist
- HDD checklist
- Design/Code checklist
- Model-Based Design checklist
- Generated Code checklist
- HTP checklist
- HCI checklist
- HECI checklist
- VCI checklist
- HVR checklist
- RTM checklist
- Tool Qualification Data checklist
- HAS checklist
Transition Review Checklist Set includes:
- General Audit checklist
- Transition to Planning checklist
- Transition from Planning checklist
- Transition from Requirements checklist
- Transition from Conceptual Design checklist
- Transition from Detailed Design checklist
- Transition from Implementation checklist
- Test Readiness Review checklist
- Final Compliance Review checklist
- Hardware Conformity Review checklist